Abstract:It is key to determine accurately the preformed settlement when sand bag embankment created on soft soil foundation.Relying on PMB petrochemical project in Brunei,the influence factors of preformed settlement during the embankment construction period are analyzed,and the preformed settlement of embankment is calculated by hyperbolic method.