Scheme of technical renovation for 1#and 2# berth in Jiujiang Public Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    At present,due to the structural adjustment of the port freight companies along the Yangtze River,the change of the varieties of goods transported are not adapted to the wharf.In order to improve the utilization efficiency of the Yangtze River port shoreline,based on in-depth analysis of the requirements for technical renovation of the terminal,combined with the provisions of the relevant national standards and finite element calculation results of structural members,we adopt the method of strengthening or replacing the local component of the wharf and increasing the related facilities to the wharf.

    Reference
    Related
    Cited by
Get Citation

魏兴龙.九江港理文公用码头1#和2#泊位技术改造方案[J].水运工程,2017,(S2):83-85

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2017
  • Published:
Article QR Code