Application of blasting and silting technology in deep water cofferdam construction of Dalian New Airport
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Offshore filling artificial island program is adopted in the new airport project construction,whose deep water cofferdam is constructed using blasting crushing and silting method.Effective determination of the amount of explosives and explosives buried depth and other related construction parameters in deep water cofferdam treatment process is key and difficult.Taking the B27 cofferdam midpoint as the research object,this paper calculates the blasting parameters,proposes construction process,and analyses the construction effect.

    Reference
    Related
    Cited by
Get Citation

丁洋洋.爆破挤淤技术在大连新机场深水围堰施工中的应用[J].水运工程,2017,(S2):51-54

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2017
  • Published:
Article QR Code