Abstract:The permeable framework with six sides has good scour and silt action under the action of water flow.In recent years,it obtains a large area application in the Yangtze River channel regulation project,which becomes gradually as an indispensable engineering component in waterway regulation engineering.Because the prefabrication is used pure manual production,the process is relatively backward.This paper introduces the integral six-side permeable frame prefabricated pumping fabric technique to achieve the mechanical prefabrication.Compared with the traditional process,the mechanization of prefabrication can ensure the quality and working schedule,and reduce the cost.