Abstract:Based on the riprap slope,a post-construction settlement prediction method is proposed.The post construction settlement is predicted by the e-p curve and the borehole probing method,and the post construction settlement prediction is made with the actual settlement monitoring data.Taking Yangshan Deepwater Harbor area as an example,this method is used to predict the construction of rubble embankment,and it is proved to be perfect.