    Abstract:

    Combined with 2 practical construction cases,the cutting through riprap layer and rear sand leakage of linkage construction is studied,which links gravity wharf to sheet-pile wharf. Masonry drill is used to cut through riprap layer. High pressure grouting pile is used to prevent rear sand leakage.