Abstract:Combining with the experience in the construction supervision for the diaphragm wall of sheet-pile wharf,we carry out a systematic analysis of common problems in supervision quality control process,such as wall construction,mud production,trench excavation,groove detection,joint pipe installation and removal,reinforcement cage manufacture and installation,etc. According to the focal points of supervision management in construction process,we analyze necessary supervision control measures.