Fine quality control of large diameter and ultra-long rock-socketed pile construction in Yangshan Deep-water Port Phase Ⅳ project
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    Rock-socketed pile with character of plenty of construction links is an important part of pile foundation project,and its quality control is difficult.Based on rock-socketed pile construction in Yangshan Deep-water Port Phase Ⅳ project, this article discusses the fine management measures from making holes of rock-socketed piles,installation of steel cage,concrete pouring,etc.,to ensure the construction quality of the fine management measures,and to form standard control procedures.

    Reference
    Related
    Cited by
Get Citation

SHEN Shumao. Fine quality control of large diameter and ultra-long rock-socketed pile construction in Yangshan Deep-water Port Phase Ⅳ project[J]. Port & Waterway Engineering,2017(S1):77-81.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: July 10,2017
Article QR Code