Abstract:The construction quality control measures for caisson gravity wharf are mature and perfect,but they are difficult to be done in the site construction.Aiming at the difficulties of rubble-mound foundation bed after acceptance,elevation control and backfill material in the box after a riprap mound slope control problems in projects,we refer to standard data and actual test,then obtain effective control measures.