Abstract:For validation of long spiral drilling pressure filling pile in water transport engineering adaptability and feasibility of the application,this paper takes a yard project application as example.Through the test pile and bored cast-in-situ concrete piles and the normal circulation process analysis,it proves that the technology has a technical feasibility,quality stability,significant economic and environmental benefits and popularizing value in water transport engineering in Caofeidian area.