    Abstract:

    There is certain similarity between the dike closure and gap closure.In the research of reclamation technology of the past,many differences were ignored.There is few research on deep groove block.Combined with deep trough blocking construction of Tongzhou Bay reclamation sand waist phase II channel engineering,the cause of deep trough formation of the coastal region is analyzed,while the construction processing techniques and notes are indicated.

    Reference
    Related
    Cited by
Get Citation

刘海兵,韩云开.通州湾腰沙围垦二期通道工程深槽段封堵工艺[J].水运工程,2017,(S1):49-52

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 10,2017
  • Published:
Article QR Code