Abstract:There is certain similarity between the dike closure and gap closure.In the research of reclamation technology of the past,many differences were ignored.There is few research on deep groove block.Combined with deep trough blocking construction of Tongzhou Bay reclamation sand waist phase II channel engineering,the cause of deep trough formation of the coastal region is analyzed,while the construction processing techniques and notes are indicated.