Abstract:Due to the plugging effect and the discount of the soil squeezing effect,the vertical bearing mechanism of large diameter open-ended steel pipe piles is far more complex than that of precast concrete driven pile.Based on the results of the test piles project of large-diameter steel pipe piles of a certain harbor engineer,combined with the current cod for pile foundation of harbor engineering,this paper studies the vertical bearing mechanism of large diameter open-ended steel pipe piles.