Abstract:Taking the sand waist phase I,II channel engineering as an example,from the view of project impact on the surrounding environment and engineering,a series of measures to optimize the environment is put forward aiming at construction scheme,the solid waste treatment,biological protection in construction period and related effects in operation period,while the risk of environment can be minimized.