Simple wave elimination measures in construction zone for settlement of steel cylinder structure
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    The temporary wave elimination measures for construction area were developed to deal with technical problems in the settlement of steel cylinder structure.Four types of floating breakwater with different principles were proposed to attenuate wave:floating barge with rigid wall,floating barge with flexible wall,water bag raft and V-shaped water bag group.A series of experiments were carried out to compare the wave transmission coefficient of the floating breakwaters.The influence of wave period and angle on wave attenuation performance was analyzed .The results showed that V-shaped water bag group with angle of 60° had a better attenuation performance than the other floating breakwaters.

    Reference
    Related
    Cited by
Get Citation

李宗哲,徐 超,刘庆茶.钢圆筒沉放施工区域简易消浪措施[J].水运工程,2017,(12):245-249

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: December 12,2017
Article QR Code