Systematic construction technology of deepwater sheet pile wharf under strong wave condition
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the constructing project of Hadarom Port at Ashdod,Israel,aiming at the problems of construction of Quay 27,such as the storm in winter bringing more risk to the uncompleted structure of sheet piles and the limited equipment and insufficient work efficiency not able to complete the structure of Lee breakwater as a shield for Quay 27,we propose the thought of an embankment constituted of reclamation material to be regarded as the shield for Quay 27 before Lee breakwater is completed.More in this way,the anchor piles could be driven by crane on land,and the problems in project are solved.The technology has the advantages of good construction continuity and strong feasibility under strong wave conditions.This systematic construction plan could be used as a reference for the projects constructing sheet piles in similar condition.

    Reference
    Related
    Cited by
Get Citation

乐 砾,吴遵奇,陶 然.强浪条件下深水板桩码头成套施工技术[J].水运工程,2017,(12):240-244

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2017
  • Published:
Article QR Code