    Based on the investigation and analysis of the supplement of sediment resource in the Yangtze Estuary deepwater channel and the sand demand for the reclamation in Shanghai,we find out the supply and demand relationship of the dredged soil.The results show that:the deepwater channel dredged soil is a clean sediment resource that can be used for the tideland reclamation.In the 13th five-year period,the total production of the deepwater channel dredged soil will be around 315 million m3,which cannot fully meet the requirements of Shanghai of about 400 million m3.Different reclamation projects can utilize the dredged soil of different sections of the deepwater channel.

    Reference
    Related
    Cited by
Get Citation

程海峰,夏 方,刘 杰,韩 露,王珍珍.长江口深水航道疏浚土“十三五”造地利用研究I——疏浚土资源供需分析*[J].水运工程,2017,(12):51-56

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2017
  • Published:
Article QR Code