Reel and spindle connection technology of large ship lift
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because large ship lift bearing capacity is large,its drum and shaft can hardly meet the requirements if using the conventional connection.We analyze various connections of the drum and shaft,thus develop a new connecting technology for Jinghong ship lift project to solve the technical problems of processing and assembly.Based on the theoretical calculation,the structural size has been determined,then the design and production of 16 large drum devices have been successfully completed.

    Reference
    Related
    Cited by
Get Citation

杜 波,刘同欣,高文君.大型升船机卷筒与主轴连接技术[J].水运工程,2017,(12):30-33

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2017
  • Published:
Article QR Code