Difficulties and countermeasures of dredging scheme for 12.5 m deepwater channel of north Fujiangsha waterway
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    As the key section of dredging in the second phase of the 12.5 m deepwater channel of the Yangtze River below Nanjing city,North Fujiangsha waterway is easy to be affected by the erosion of the sand and the sand in the upper reaches of the Jingjiang shoal,and the changes of river regime are complex.Aiming at the difficulties in the turning area layout,mud line layout and bow blowing,we carry out a research on the construction condition,navigation regulations,construction efficiency,construction safety,as well as the economic rationality,etc.Combining theoretical calculation and practical construction experience,we put forward countermeasures,so as to optimize the north Fujiangsha waterway 12.5 m dredging scheme and meanwhile provide reference for the inland river dredging construction of the Yangtze River in the future.

    Reference
    Related
    Cited by
Get Citation

张旭东,金震宇,刘 红,袁文昊.福姜沙北水道12.5 m深水航道疏浚方案的难点与对策[J].水运工程,2017,(11):146-151

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 17,2017
  • Published:
Article QR Code