Span arrangement of bridge for Shanghai inland channel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the impacts of the bridge’s span arrangement on the construction cost,engineering implementation,as well as the landscape,considering the characteristics of waterway construction and waterway-crossing bridge construction in Shanghai,and analyzing relevant requirements on the bridge’s span arrangement stipulated in the current codes,we explore a more reasonable way of ridge’s span arrangement and get to know the condition for the pier installation in water,so as to provide reference for the code modification.

    Reference
    Related
    Cited by
Get Citation

邓丰昌,郑 静.上海市内河跨航道桥梁布跨方式[J].水运工程,2017,(11):120-123

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 17,2017
  • Published:
Article QR Code