Integrated construction technology of dredging and filling in deepwater channel of the Yangtze River Estuary
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the Yangtze River Estuary area in recent years,some new reclamation projects cannot excavate the storage pit because of constraints or cost control.Through Changxing submerged breakwater engineering construction,we introduce the construction technology for integration of deep-water channel dredging and filling in the Yangtze River Estuary,and discuss the key technologies of dredging,anchoring and bowing.The construction technology does not need to set the storage pit,and the dredging soil could be pumped to the shore for land reclamation.It is very effective,resulting in a comprehensive benefit in the Yangtze River Estuary area.

    Reference
    Related
    Cited by
Get Citation

石 进,刘 栓,宋理想.长江口深水航道疏浚吹填一体化施工工艺[J].水运工程,2017,(10):216-220

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 12,2017
  • Published:
Article QR Code