Cause analysis and treatment scheme of landslide on left bank slope of Naji navigation project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the analysis of the causes of the landslide problem in the upper reaches of the left bank slope of Naji navigation junction project,it is concluded that we shall pay attention to the stability of slope soil,the sudden drop of the groundwater level,as well as the erosion and adsorption of the bank slope.Two treatment schemes,i.e.slowing down the bank slope scheme and cement mixing pile reinforcement scheme,are put forward for the bank slope landslide.Comparing them in safety,construction,project investment and project effect,we recommend the slowing down bank slope schemed.

    Reference
    Related
    Cited by
Get Citation

朱卫国,罗 明,李穗清.那吉航运枢纽工程左岸岸坡塌方原因及处理方案[J].水运工程,2017,(10):192-196

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 12,2017
  • Published:
Article QR Code