Layout of 5 000 DWT channel breakwaters in Weifang West Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The 5 000 DWT channel of Weifang West Port is located in Xiaoqing River estuary.Because of severe sedimentation,we design 5 000 DWT channel with breakwaters to improve the development of Weifang West Port,and put forward three layout schemes.Based on the wave,tidal flow and sediment mathematical model,we analyze the amount of silting for each planning scheme,also calculate the engineering construction cost of each planning scheme.Based on the analysis of life cycle cost (LCC),we confirm the short dyke as the optimal scheme after the comprehensive analysis.

    Reference
    Related
    Cited by
Get Citation

杨晓松,高 涛,梁文文.潍坊港西港区5 000吨级航道防沙堤布置方案[J].水运工程,2017,(9):148-153

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 15,2017
  • Published:
Article QR Code