Model experiments of phaseⅡchannel regulation project in Heishazhou Waterway downstream the Yangtze River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Heishazhou Waterway is one of the main navigation-obstructing shallow waterways downstream the Yangtze River.After the phaseⅠchannel regulation project,channel conditions are improved gradually.But when encountered the flood years,channel silts seriously so that the phaseⅡof the regulation project is needed.Based on the characteristics of waterway evolution and navigation-obstruction and using movable bed models experiments,this paper researches the phaseⅡof the regulation project systematically and proposes the recommended scheme.After the scheme,river regime of Heishazhou Waterway is no obvious change;the discharge of the right channel increases and the shoal area is scoured.The channel conditions are improved effectively.

    Reference
    Related
    Cited by
Get Citation

牛晨曦,假冬冬,张幸农.长江下游黑沙洲水道航道整治二期工程模型试验研究*[J].水运工程,2017,(7):149-154

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2017
  • Published:
Article QR Code