Abstract:Aiming at problems of temporary cofferdam project of a coastal dock in Beibu Gulf,such as the western deep water(4.0~7.6 m),close to the edge of the fishermen habitual channel,this paper recommends the dike core structure through the comparison of multiple schemes,which is made with ductile soil pipe and large woven bag sand.The practical problems of project are solved successfully by the scheme.