Blasting compaction embankment remedy for no blast through sand layer in silt foundation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Embankment remedy is researched to solve the problem of no blast through sand layer in thick silt foundation happened in Da-xiao-yushan south embankment project.According to construction technology,the reasons for no blast through the sand layer are simply analyzed.Then simple Bishop method is used to check stability of the problem embankment.Remedy is proposed to comparatively analyze stability of the bad blasting compaction and the ideal blasting compaction.Results show that the stability of embankment can be improved if increasing landside blast,and at the same time thickening and widening anti-slide loading berm.It provides an important reference for foundation treatment design and construction in such complex silt foundation with sand layer.

    Reference
    Related
    Cited by
Get Citation

刘 阳,刘家才,许增会.爆破挤淤堤未爆穿软基中砂夹层的补救措施[J].水运工程,2017,(6):203-207

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 15,2017
  • Published:
Article QR Code