Sudden siltation of outer waterway and diggability of proposed channel in Binzhou Harbor area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on Binzhou Port field observation data such as water depth,sediment,the dynamic changes and seabed erosion and siltation in Binzhou Harbor are analyzed,and sudden siltation in outer channel and feasibility of channel are discussed.The result shows that siltation in windy days will be the focus and difficulty in Binzhou Harbor.Though in the case of channel dimension and direction with Huanghua port are basically the same,the siltation of Binzhou Harbor will be worse than in Huanghua port.Binzhou Harbor waterway dredging has certain difficulties,and it is really possible to appear “the iron sand” in a certain range outside -6 m isobaths in bad weather conditions.Based on anticipation,particle size is coarser in Binzhou Harbor than in Huanghua port,and clay content is less than the Huanghua port.It is predicted that outer channel excavation(or clearing)is more difficult.

    Reference
    Related
    Cited by
Get Citation

吴明阳,谢华亮,刘 涛.滨州港外航道骤淤研究及可挖性分析*[J].水运工程,2017,(6):126-131

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 15,2017
  • Published:
Article QR Code