Abstract:Based on the design data and construction experience of CSSC Changxing shipbuilding base,we establish a 3D finite element model to analyze space-time effect and deformation characteristics of large paratactic dock.We propose reserving partial soil mass before building ground floor and excavating the reserved parts after dock wall steel sheet pile,which can control deformation of dock chamber foundation excavation.