Abstract:On the issue that the traditional construction equipment such as pile driving barge,floating crane,jack-up,etc.can hardly satisfy the accuracy and schedule requirements of piling construction under the strong wave condition,this paper comprehensively applies the incremental launching construction method of bridges,and proposes the solution as the hydraulic movable platform based on the steel pipe pile construction of Q28 in Hadarom Port project in Ashdod,Israel.