Stability calculation of new bamboo embankment structure in reclamation engineering
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    That the bamboo structures replace the traditional riprap and bagged sand dike as reclamation area partition dike is a new design idea.In order to understand the overall safety and stability and reasonable scale of the new embankment structure under the effect of land reclamation soil pressure,the paper analyzes the factors affecting the stability of the overall safety based on the bamboo structure construction of external condition.Impoundment is used to balance soil pressure.Element software PLAXIS is used to calculate different projects composed of different water heads and different number of spans of bamboo structure.

    Reference
    Related
    Cited by
Get Citation

赵沧海,李军雪,王海华,汤子璇.围区吹填造地新型竹隔堤结构稳定性计算[J].水运工程,2017,(5):73-77

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: May 17,2017
Article QR Code