    Combined with the Hong Kong Zhuhai Macao Bridge Tunnel Engineering foundation leveling, the calculation methods are put forward to analysis inserting and pulling pile of leveling ship legs in different geological conditions. It is concluded the leg buried layer of self elevating riprapping leveling ship in the work state , and the ultimate bearing capacity and pullout ultimate load of pile legs in the construction of the leveling ship inserting legs. At the same time, pre control measures in the special geological conditions are put forward. The practice proves that the analysis and calculation method is correct.

    Reference
    Related
    Cited by
Get Citation

冯海暴,曲俐俐,魏红波.支撑式平台整平船桩腿拔桩力计算[J].水运工程,2017,(4):185-189

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 17,2017
  • Published:
Article QR Code