Abstract:No.28 Quay of Ashdod Hadarom new port is a steel pipe pile foundation of high piled wharf.Site construction should face technique issue of the wide variedly construction procedure of fabricated mobile platform,the pile driving precision control,floating platform anchor limited anchor position and the limited window period of Jack-up platform moving.Through the deep analysis of traditional construction method,we creatively adopt hydraulic moveable platform,which can solve the site technique problems and ensure No.28 Quay pile driving smoothly.