    The original large pipe pile joint precast technology has to use imported equipment and combined forming process.The complex equipment is not suitable for site construction.In order to simplify the construction equipment,reduce the construction cost and improve the engineering quality,we develop a new water absorption technology under the vacuum process,by which,qualified large pipe pile joint is produced by simple production process.