Duration and cost real-time control of high-piled wharf construction based on 5D-BIM
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Current construction management based on 2D construction drawings has disadvantages on duration calculation and real-time data processing.This paper presents a construction site management method based on 5D-BIM(5 dimensions-building information modeling),which provides an efficient tool of duration and cost control with highly efficient capability of data processing,friendly interface,rapid and accurate cost calculation,and 4D real-time display.

    Reference
    Related
    Cited by
Get Citation

毕 磊,于 水,丁 琼,芦志强.基于5D-BIM的高桩码头工程施工进度-成本实时控制[J].水运工程,2017,(3):189-193

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 16,2017
  • Published:
Article QR Code