Impacts of bay mouth reclamation on hydrodynamic environment of Qinzhou Bay
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper discusses the impacts of bay mouth reclamation on the inland sea and channel from three aspects:tide,tidal flux and water change.Results show that the two projects have little influence on the inner bay.For Jin’gu River,reclamation narrows the channel width,decreases the flow velocity and diminishes the tidal flux by 17%.The half-exchange period is extended by 1.21 days.Lao-ren sand enclosure can strengthen the tidal volume of east channel but has little influence on Jin’gu River,because the narrowing of Jin’gu river may diminish the water diversion ratio.Though bay mouth reclamation partially takes up the middle channel,it has little influence on the inner bay,which means future reclamation planning can be considered the middle channel and beaches on its both sides.

    Reference
    Related
    Cited by
Get Citation

李逸聪,王义刚,黄惠明.湾口围填海对钦州湾水动力环境的影响[J].水运工程,2017,(3):44-50

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 16,2017
  • Published:
Article QR Code