Observation of the hydraulic prototype in the energy dissipation zone cofferdam of the Fuchunjiang ship lock expansion and renovation project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Fuchunjiang ship lock expansion and renovation project is carried out under the working condition of the hydropower hinge.Due to the complex geological conditions of the flood discharge area,there are great difficulties in seepage control technology.This paper introduces the control construction and treatment methods of the completed cofferdam seepage.Positive side flow velocity,impact pressure,pulsating loads and other hydraulic parameters are collected through prototype observation of overcurrent cofferdam.

    Reference
    Related
    Cited by
Get Citation

楼伟中,王恕,刘传新,王甘林.富春江船闸改造工程消能区围堰水力原型观测与研究[J].水运工程,2017,(2):106-109

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 19,2017
  • Published:
Article QR Code