Abstract:Fuchunjiang ship lock expansion and renovation project is carried out under the working condition of the hydropower hinge.Due to the complex geological conditions of the flood discharge area,there are great difficulties in seepage control technology.This paper introduces the control construction and treatment methods of the completed cofferdam seepage.Positive side flow velocity,impact pressure,pulsating loads and other hydraulic parameters are collected through prototype observation of overcurrent cofferdam.