Abstract:With the economic development of port hinterlands in the Third World countries,numerous port rehabilitation and upgrading projects emerged.This paper analyzes the constraints and key issues arisen in these projects based on a case in Africa,and carried out a comparative analysis on the reconstruction scale determination,the design of new quay line and the general layout of ro-ro terminal,the stability and integrity of marine structure,as well as key factors needing consideration during construction.