Abstract:To solve key technical problems such as reliable driving and precise positioning of steel cables on the drum,as well as synchronized winding of cables while installing steel cables on a drum of more than 4 m in diameter,we take comprehensive control measures and accomplish installation of 64 steel cables on 16 drums with desired installation precision and satisfactory effect achieved.