Dredging strategy and methodology for long artificial channel
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    From the aspects of dredging volumes and soil property,spoil disposal area and sailing distance,dredging equipment,environmental strategy,dredging schedule and cost estimates,the dredging strategy and methodology for long artificial channel are analyzed based on 250 000 DWT channel design in Morebaya river of Guinea Simandou.Dredger production rate calculation method and the related key factors,dredger time and cost estimates are analyzed emphatically.The cost involves fuel cost,crew cost,depreciation cost,maintenance repair cost,general and administration cost,contingency cost,contractor’s margin and mobilization cost

    Reference
    Related
    Cited by
Get Citation

谭凤,王琳,吴美平.人工开挖长航道的疏浚策略与方法[J].水运工程,2016,(10):152-156

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 18,2016
  • Published:
Article QR Code