Improvement technology of Baimaosha channel in the Yangtze River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In phaseⅠ(Taicang to Nantong section)of 12.5 m deep-water channel project from Nanjing in the Yangtze River,to achieve the goal of “curbing adverse trends and improving channel conditions”,we carried out riverbed evolution analysis,mathematical model calculation and physical model test and determined the regulation scheme at last.Based on a multi-program comparison,we chose the flexible mattress,riprap embankment and component embankment as the engineering measures,and developed a new beach protection structure,i.e. the active hook, and applied it to the project.

    Reference
    Related
    Cited by
Get Citation

方爱东,王效远,赵凯.长江白茆沙航道整治技术[J].水运工程,2016,(10):136-140

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 18,2016
  • Published:
Article QR Code