Abstract:According to the requirement on water level calculation stipulated in Chinese code for port engineering,the long-term & short-term real-measured water level are needed. Due to the lack of observation data for overseas projects,design water levels can not meet the requirements of Chinese Code. Based on Ain Sukhna project in Egypt,we calculate the water level of port engineering,and expound clearly the similarities and differences of calculation methods for the water level at home and abroad.