Upgrading and reforming methods of sea wharf structures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the practical sea wharf structures upgrading and reforming cases,this paper classifies wharf structures into two categories depending on whether the wharf apron is advancing or not.In condition of fixing wharf apron,we present three practical reforming cases:reform of rubble bed,addition of independent structure ahead of foundation and addition of accessory structures.In condition of advancing wharf apron,two cases are presented:newly constructed structure combined with old structure or newly constructed structure independent to the old one.For the open type wharf on piles with fixed wharf apron,the cases of separated structure and combined structure are presented.

    Reference
    Related
    Cited by
Get Citation

HU Jia-shun, REN Zeng-jin, WU Zhe-feng. Upgrading and reforming methods of sea wharf structures[J]. Port & Waterway Engineering,2016(10):90-94.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 18,2016
  • Published:
Article QR Code