Innovative application of power supply system for Yangshan deepwater port phase IV project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    New technology,new product,new material,new process are widely used in the power supply system of Yangshan deepwater port phase IV project.For example,the over-voltage protector with dual safety protection device for all phases in six posts guarantees more reliable and safe operation of the equipment;the use of DEHN series earth clamp not only facilitates the construction,but also ensures easy control of construction quality;the roxtec cross sealing system effectively solves the problem of cable sealing and future expansion.

    Reference
    Related
    Cited by
Get Citation

姚 宇,胡建勇,陈伟治.洋山四期工程供电系统创新应用[J].水运工程,2016,(9):163-166

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 08,2016
  • Published:
Article QR Code