Handling technology design for automated container terminal of Yangshan deepwater port phase IV project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the engineering characteristics of Yangshan deepwater port phase IV project,we choose the automatic handling technology system.Optimizing the equipment selection and layout of container terminal automation technology,we solve problems including connection between the wharf handling and horizontal transportation system,the capacity of container yard restricted by the narrow land,balanced utilization of the RMG between the seaside and the landside in one yard,high handling costs of long-distance round-trip,etc.,and lay a solid basis for giving full play to the superiority of the automatic container terminal.

    Reference
    Related
    Cited by
Get Citation

吴沙坪,何继红,罗勋杰.洋山四期自动化集装箱码头装卸工艺设计[J].水运工程,2016,(9):159-162

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 08,2016
  • Published:
Article QR Code