General layout of fully automated container terminal in phase IV of Yangshan project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In phase IV of Yangshan project,the container terminals are constructed along the rich deep-water shoreline.However,the limited land width has always been the main restriction of the port capacity.To maximize the utilization rate of the resources of water and land,we probe into the construction condition and construction target.Taking comprehensive measures including determining reasonably the handling technology and layout of the stack yard,road and auxiliary facilities and optimizing the transport organization,etc.,we reach the targeted goal of reasonable function-orientation,high land utilization rate and great comprehensive capacity.Integrative capabilities can be remarkably improved.

    Reference
    Related
    Cited by
Get Citation

刘广红,程泽坤,罗勋杰,庄 骅,何继红.洋山四期工程全自动化集装箱码头总体布置[J].水运工程,2016,(9):46-51

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 08,2016
  • Published:
Article QR Code