    Abstract:

    After the 175 m trial impoundment of the Three Gorges Reservoir,cumulative siltation occurred in Shangluoqi reach in Three Gorges Reservoir area,with a small amount and mainly in the deep channel and beach.Since channel scale margin of Shangluoqi reach in the fluctuating period is not large,a little amount of sediment deposition can worsen the channel conditions.This paper analyzes channel condition changes of Shangluoqi reach during 2011—2012 using measured terrain data,and puts forward the maintenance dredging scheme of Shangluoqi reach in the falling stage of the Three Gorges Reservoir.

    Reference
    Related
    Cited by
Get Citation

苏 丽,王 涛,刘 陈,解中柱.三峡库区上洛碛河段消落期维护疏浚方案[J].水运工程,2016,(7):158-164

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 12,2016
  • Published:
Article QR Code