Setting of gravel sub-base under concrete pavement of roads and storage yards at the port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The harbor land area formed by backfilling hill stones(broken bits)is served as the earth base under the pavement of roads and storage yards after dynamic compaction and vibration rolling. At present,the generally adopted rebound modulus is 60 MPa,and on the earth base,the gravel sub-base which is about 200 mm thick is set.Through the engineering project finished in Dalian port to inversely calculate the rebound modulus of earth base,it is considered that the rebound modulus of earth base adopted under the concrete pavement is too low and can be largely improved.According to relevant regulations of the specification,it is not necessary to set sub-base.

    Reference
    Related
    Cited by
Get Citation

牛晓丹,胡 鹏.港口道路、堆场混凝土铺面垫层的设置[J].水运工程,2016,(7):51-53

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 12,2016
  • Published:
Article QR Code