Inspection method for deepwater non-bottom protection thin-layer riprap construction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The application of non-bottom protection thin-layer riprap structure in the deep water area is increasingly widespread,but the inspection and acceptance for it stipulated in the existing code is difficult to adapt to the actual situation effectively.Based on the typical construction in the non-bottom protection thin-layer riprap construction in the 12.5 m Yangtze estuary deepwater channel phase I project Baimaosha bid I newly-built lock area,we carry out a systematic analysis of the construction technique and quality control of non-bottom protection thin-layer riprap,so as to provide reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

莫建波,陈 翔.深水无护底薄层抛石施工验收方法[J].水运工程,2016,(7):6-10

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 12,2016
  • Published:
Article QR Code