Application of multi-head stirring pile and high-pressure spraying pile in construction of seepage proof curtain of deep foundation pit
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the construction principle of multi-head stirring pile and high-pressure spraying pile,and proposes a method which combines the multi-head stirring pile with high-pressure spraying pile in seepage engineering construction,which was used in the seepage proof curtain of Jiuwei port second-line ship lock project. According to the actual application,we compare the quality effect,construction cost and construction efficiency of the two construction methods.The results show that both of them can meet the requirement of seepage control,but multi head mixing pile has more advantages in economy and work efficiency,and its engineering adaptability is relatively poor. Based on the two characteristics,the construction technology which combines multi head mixing pile with high pressure spraying pile will be widely used in various types of seepage engineering.

    Reference
    Related
    Cited by
Get Citation

MA Jun. Application of multi-head stirring pile and high-pressure spraying pile in construction of seepage proof curtain of deep foundation pit[J]. Port & Waterway Engineering,2016(6):183-186.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 16,2016
  • Published:
Article QR Code