Construction difficulties and countermeasures of dredging project in the first phase of 12.5 m deepwater channel of the Yangtze River below Nanjing city
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the first dredging and pumping ashore project in the Yangtze River,unprecedented difficulties and technical problems were encountered during the construction.Based on the analysis of the Yangtze River,fine silt,clay and other complex project conditions,the drag head and teeth were improved,the craft parameters of dredging and the program of pumping ashore were optimized,which improved the construction efficiency and provided reference for the future dredging and pumping ashore construction of self-propelled trailing suction hopper dredger in the Yangtze River.

    Reference
    Related
    Cited by
Get Citation

朱时茂,郭素明.长江南京以下12.5 m深水航道一期疏浚施工中的难点与对策[J].水运工程,2016,(4):7-12

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 12,2016
  • Published:
Article QR Code