Abstract:Taking the exceeded deviations of block installation during construction of Angola certain gravity block type quay wall for example,according to the sea-side actual measurement data,and using three stages of gradual processes analysis including static calculation,amended static calculation,and finite element analysis,we analyze the stress of blocks exceeding the install deviation to provide a basis for the reasonable arrangement of the follow-up work,and serve as reference for solving the construction problem and ensure the construction progress as well.